We started construction on a big remodel job for one of our customers recently. They are adding on a master suite, a dining room, a living room, a man cave, a back deck, a portico and entry. We are also redoing all the rock, replacing all siding with stucco, replacing roof with new standing seam metal, redoing all the floors inside, redoing all the paint inside, updating their HVAC and replacing all the windows and doors. Here are the before pictures and the start of construction. Stay tuned as we continue to work on this project and update with more photos.
If you or someone you know is in the market to build new, add on or remodel, please contact us today!
830-626-3350
parkerrenovations@att.net
Front of House Before Construction:
Back of House Before:
Grading Begins for Portico:
Saltillo Tile Removal:
Interior Before:
Garage Before- Future Man Cave:
Construction Begins on Master Suite:
Another Before Pic:
View Before:
Carlos' Cantina Addition (Man Cave):
Portico: ready to pour:
Extreme Pumping helped us out with this one:
Carlos' Cantina Bathroom Addition:
Everyone hard at work:
Slab is poured:
Back side of Master Suite- Concrete forms are set:
Master Suite is Poured:
Portico is poured:
Septic is installed:
Framing for Carlos' Cantina:
What was once a garage, is now becoming a great man cave:
Existing Exterior Wall Removed- New Dining Room Coming Soon!
Existing Exterior Wall Removed- New Living Room with 16' NaNa Walls Coming Soon!
Walls are framed and sheathed in the master suite: